BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20220407T210000Z
DTEND:20220407T213000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Ribbon Cutting: Hill Technical Solutions
DESCRIPTION:Please join us for a Ribbon Cutting for Hill Technical Solutions!\n\n\n\nEvery aspect of military and space projects is vitally important\, not only to our Customer's success\, but also to the safety of our nation. At HTS\, we understand the weight of our Customers' burdens. We are wholly committed to supporting their projects from concept development to deployment and through fielding\, operation\, and sustainment. From high-security confidential projects to high-visibility public-facing ventures\, we ensure each project has the right people and technology in place to progress and succeed.\n\n\n\nOur solutions include\n\n	Digital Engineering\n	Hardware-In-The-Loop (HWIL) Solutions\n	Modeling\, Simulation\, & Analysis\n	System Assessments
X-ALT-DESC;FMTTYPE=text/html:<span style="font-size:16px\;">Please join us for a Ribbon Cutting for <strong>Hill Technical Solutions</strong>!<br />\n<br />\nEvery aspect of military and space projects is vitally important\, not only to our Customer&rsquo\;s success\, but also to the safety of our nation. At HTS\, we understand the weight of our Customers&rsquo\; burdens. We are wholly committed to supporting their projects from concept development to deployment and through fielding\, operation\, and sustainment. From high-security confidential projects to high-visibility public-facing ventures\, we ensure each project has the right people and technology in place to progress and succeed.<br />\n<br />\nOur solutions include</span>\n<ul>\n	<li><span style="font-size:16px\;">Digital Engineering</span></li>\n	<li><span style="font-size:16px\;">Hardware-In-The-Loop (HWIL) Solutions</span></li>\n	<li><span style="font-size:16px\;">Modeling\, Simulation\, &amp\; Analysis</span></li>\n	<li><span style="font-size:16px\;">System Assessments</span></li>\n</ul>\n
LOCATION:Parking available in the front of the building.
UID:e.2112.13357
SEQUENCE:3
DTSTAMP:20260418T032731Z
URL:https://cm.hsvchamber.org/events/details/ribbon-cutting-hill-technical-solutions-13357
END:VEVENT

END:VCALENDAR
